How our crew handles it
Interior work makes up most of our photo library, and it shows the range: bathrooms stripped to block and studs, kitchens with cabinets and flooring removed, basements opened up, and rooms taken back to bare slab. We also handle fire-damaged interiors, where ceilings are burned through and everything has to come out before rebuilding can start.
Every interior job starts by deciding what stays. Plumbing stacks, electrical panels, stairs and any load-bearing wall are marked before we lift a tool. If a wall might be carrying load, we stop and bring in an engineer rather than guess. Where the house is older, we check the Designated Substance Survey first, because vermiculite, asbestos plaster and old floor tile are common in Toronto homes built before the 1980s.
Bathrooms are the most common single-room job. You can see the sequence in our photos: fixtures out, tile broken off the walls, the tub broken up and removed, and the shower base opened down to the drain. We cap supply lines and protect the drain so nothing drops into it. Kitchens follow a similar path, with cabinets removed intact where the client wants to reuse or donate them.
Flooring is a job of its own. Tile over mortar, glued-down hardwood and old vinyl each come up differently, and we scrape back to a sound subfloor or slab so the next trade can start straight away. Several photos show floors taken right down to the joists where the subfloor had to go too.
Throughout the job we protect what is staying with floor sheeting and doorway barriers, bag debris as we go, and carry it out through a single route. At the end you get a swept, empty space.
