Separate the shared spaces by what changes

Separate the shared spaces by what changes
SpaceExample removal decisionRetained interface
Entrance lobbyReplace fixed reception joinery and selected finishesEntrance doors, building systems and surfaces outside the design
Residential corridorRenew specified flooring or wall finishesSuite thresholds, doors and adjoining floor levels
Amenity roomChange assessed partitions and fixed cupboardsShared circulation and retained services

This is an illustrative scope comparison, not a record of Clearpath projects. A finish renewal along a corridor is different from reconfiguring an amenity room, even when the same finish palette is used.

Describe the junctions users cross

Follow corridor flooring to suite doors, lift lobbies and stair entrances. The receiving installer determines the new finish transitions and repairs. Do not assume removing a covering also includes every backing layer or establishes the final surface level.

In a lobby, distinguish loose furniture from attached desks, display joinery and connected fixtures. Management identifies ownership and retained functions. Elevator equipment, access-control systems and fire-protection work need their responsible specialists; they are not included by calling the area a lobby strip-out.

Agree access through the building team

Management and the responsible professionals determine which spaces can be released, how building users are accommodated and what arrangements apply to shared routes. A proposed phase line does not itself establish a safe or approved circulation route.

Use the phase handoff guide for recording release conditions. Keep the design comparison here focused on the physical work each stage leaves for the next contractor.

Compare two refurbishment packages

One illustrative proposal keeps the lobby layout and renews finishes around the existing desk. Another replaces the desk and changes an adjoining amenity-room partition. The second adds attachment, ceiling-edge and room-boundary questions; neither automatically includes corridor flooring on every floor.

The GC should identify where demolition stops and new flooring, millwork, services and final finishing begin. Reopening decisions belong to the building's project team.

Request a common-property assessment