Identify the acceptance document

Start with the lease-end requirement or fit-out drawing and identify who has authority to accept the result. Where documents conflict with the existing premises, record the discrepancy before treating either as the complete removal instruction.

Inventory retained systems

List base-building systems and fittings separately from tenant items. Shared electrical, ventilation, sprinklers and alarms need clear boundaries and responsible specialists where affected. A label such as “bare shell” should never be the only instruction for those systems.

Specify the surfaces

Document the ceiling, wall and floor condition required after removal. Identify whether adhesive, backing or selected finishes remain and whether further preparation belongs to the following trade. Photographs and marked drawings can support a common understanding.

  • Floor and substrate condition
  • Retained partitions and storefront elements
  • Openings and penetrations
  • Fixtures or equipment retained by the landlord

Confirm access and records

Record loading and carrying arrangements, common-area protection and the building’s relevant requirements. Identify the documents expected at handover and the process for noting incomplete or disputed items. Do not promise a particular disposal or compliance record unless it is part of the actual arrangement.

Close the loop with the right people

Arrange the review with the authorised landlord, manager or contractor. Keep a written record of the agreed condition and outstanding tasks. Use the office, retail or restaurant scope page to prepare the removal questions for your type of unit.

Translate handover labels into components

Shell, white box and turnkey can mean different things in different project documents. Use this illustrative comparison to ask for the actual specification, rather than treating any label as a standard package.

Translate handover labels into components
Label in the briefComponents to clarifyWork not inferred
ShellRetained floor, walls, ceiling and base-building systemsRepairs or new finishes
White boxExact new or retained surfaces and service conditionA universal paint, ceiling or lighting specification
TurnkeyThe completed fit-out obligations and responsible contractorNew construction supplied by a demolition scope