Start with the authorised future layout

The owner, building and responsible professionals resolve the legal, structural and building-system requirements. This guide does not establish authority to join suites or provide the opening itself. Clearpath's contribution considered here is assessed ordinary interior demolition.

Identify which rooms remain useful before listing removals. The larger combined home may keep both bathrooms but only one kitchen, or retain a second kitchen area for a different purpose.

Compare connection-only and wider renewal

Compare connection-only and wider renewal
DesignOrdinary removal questionBoundary to retain
Limited connection projectWhich finishes and fittings change around the separately designed connection?Most rooms and their finishes
One redundant kitchen removedWhich cabinets, fixtures and layers leave after trade preparation?Useful rooms on both sides
Coordinated interior renewalWhich floors, ceilings and assessed room divisions change together?Shared building elements and designated retained rooms

The comparison is illustrative. A wider renewal is not automatically necessary because two suites become one.

Follow finishes through the combined plan

Flooring may differ between suites or stop at former room boundaries. A removed kitchen can expose unfinished areas beneath cupboards. The receiving installer determines whether and how those areas join the future finish; removal alone cannot promise a continuous matching result.

Ceiling edges and attached joinery need the same attention. Describe the actual endpoint on each side rather than assuming the suites have identical construction.

Keep shared systems and access coordinated

Management and the responsible trades determine the treatment of risers, services and work access. A wall or cupboard beside a shared system should not be included under an unqualified clear-all note.

For suite-wide coordination, use the complete condo strip-out guide. Approval documentation belongs with the existing condo planning resources rather than being inferred from this scope comparison.

Request the ordinary two-suite package

Contact Clearpath with both current layouts, the proposed combined plan, retained rooms and building contact. Identify the approved connection scope and the separate ordinary removals you want assessed. Keep unresolved professional decisions visible before work is agreed.

Back to all planning guides