Compare the result with the agreed extent

Use the agreed removal extent as the checklist, not a general impression that the property looks clear. Walk through the record with the authorised receiving party using safe access arrangements. Identify removed structures, retained slabs and other agreed boundaries by the same references used in the scope.

Separate handover from approval closure

A physical handover record does not close a permit or certify that the site is suitable for new construction. Keep inspection status and professional confirmations separately identified. The Toronto inspection guide explains why the relevant authority's result matters alongside the contractor's removal record.

Assign unfinished interfaces

List unresolved openings, retained service interfaces, debris questions or follow-on tasks as specific items. Name the party responsible for the next action and the document governing it. Avoid recording an unresolved item as complete merely because the demolition crew has finished its agreed portion.

Use a residential handover record

Keep the dated record with the scope and available photographs. Record agreement and outstanding questions separately; do not use the sheet to decide liability or certify technical conditions. The house extent schedule provides a useful starting reference, while the residential service page keeps removal distinct from excavation and rebuilding.

Residential handover record

Copy these headings into your own working document and complete the rows for your property. The prompts are not findings or approval of work.

Working prompts to complete for your property
Scope referenceObserved resultOutstanding task / responsible party
Removal extentFill inAccepted / question recorded
Retained element or exposed edgeFill inNext-party condition and action
Inspection / professional confirmationSeparate statusDocument reference; not inferred complete

Keep your completed record private. Bring the relevant scope questions into the optional project planner or discuss them directly with Clearpath.