List fixtures and assemblies separately

Start with the vanity, toilet, tub, shower enclosure and any fixed storage. Then list wall and floor assemblies separately. 'Remove the bathroom' can conceal a large difference between selected fixtures and a full opening to the supporting structure. Identify which side of each assembly is within the proposed removal.

Describe the retained side

For every removed item, name what meets it and stays. A retained hallway floor, adjacent wall finish or shared service can define the edge of the task. Ask how those edges will be left and who handles reconstruction. Tile, backing, membrane and subfloor should not be treated as interchangeable layers or as an assumed complete removal package.

Keep leak investigation separate

Visible staining or a reported leak belongs in the enquiry, but it is not a diagnosis. Keep investigation, repair and specialist assessment separate from the removal instruction. In a managed building, share the relevant building contacts and requirements. Responsible trades must address affected supplies, drains and other services; the worksheet does not authorise their disconnection.

Prepare the bathroom boundary matrix

Record the fixture or assembly, the removal limit, the retained side and the next-party question. A partial bathroom plan should make exclusions as clear as removals. Use the bathroom demolition page for the enquiry and the condo packet guide where management needs a coordinated request.

When the installer specifies complete waterproofing replacement

In an illustrative shower refurbishment, the receiving installer determines that the replacement assembly needs defined tile, backing and waterproofing layers removed. List those layers and the retained structural boundary separately; do not convert the decision into permission to remove joists or adjoining construction. The installer owns the replacement design and reinstatement, with service preparation assigned to the responsible trades.

If a retained bathroom wall borders another room, ask the installer to identify the receiving edge there as well. Complete replacement of one wet-area assembly does not mean every finish in both rooms must leave.

Bathroom boundary matrix

Copy these headings into your own working document and complete the rows for your property. The prompts are not findings or approval of work.

Working prompts to complete for your property
Fixture or assemblyRemoval limitRetained side / next-party question
Vanity or sanitary fixtureFill inConnections and retained finish
Shower or tub assemblyFill inBacking and adjacent space
Wall or floor layersFill inDepth and reconstruction interface

Keep your completed record private. Bring the relevant scope questions into the optional project planner or discuss them directly with Clearpath.